China Jushi FY2009: Projects and construction progress

Named projects, stages, capacities and construction evidence.

Evidence-linked English operating research. The source and stated coverage below define the scope of this version. Source-page links provide optional verification; the English account is intended to stand on its own.

Reporting period ended 2009-12-31 / Filing published 2010-03-31
Content version 17 / 575063d74c7c / PUBLISHED

Commissioning and construction evidence

Jiujiang construction started in 2009; the first line began production after year-end

The Jiujiang expansion began construction in July 2009. It comprised two alkali-free glass-fiber furnace-drawing lines with nominal annual capacities of 70,000 and 80,000 tonnes, plus supporting works for the new base. Furnace drawing means drawing glass into fibers from a molten-glass furnace. The 70,000-tonne component had an estimated total investment of CNY 981,259,600. The annual report says this line was ignited and entered production in February 2010. This is a subsequent event disclosed in the FY2009 report, rather than evidence of production throughout 2009. Management also described a larger 350,000-tonne base programme; that wider scope is not an additional operating capacity to add to these two components. Relocation of existing Jiujiang assets to the science and technology park also affected construction accounting. The disclosure does not separate this component’s annual output, utilization or customer sales.

The second Jiujiang component was still under construction in this report

The 80,000-tonne-per-year line was the second component of the Jiujiang 150,000-tonne alkali-free glass-fiber expansion. Its estimated total investment was CNY 991,753,800. The FY2009 investment discussion describes it as under construction. This stage is retained separately from the first component’s February 2010 production start. The two component estimates sum to CNY 1,973,013,400. The financial construction note instead gives the broader Jiujiang new-factory accounting row a budget of CNY 1,970,249,330. The CNY 2,764,070 difference has no reconciliation in these passages. Both source roles remain visible; the difference is not assigned to a line or treated as an overrun. Neither estimated total investment is identified as cash paid entirely during FY2009, and nominal capacity does not establish actual annual output.

Tongxiang investment is denominated in dollars, with a separate accounting identity unresolved

Construction of the Tongxiang energy-saving and environmental furnace-drawing line began in September 2009. The disclosed nominal annual capacity was 35,000 tonnes of glass fiber. The investment discussion estimates total investment at USD 73,511,800 and describes the project as under construction. The dollar currency in this individual disclosure is preserved. No assumed exchange rate is used to combine it with yuan project budgets. The financial construction note separately labels project 224 as a Tongxiang 30,000-tonne waste-fiber furnace. Shared location and environmental wording do not prove that the two names describe the same physical line. The 35,000-tonne project retains its existing identity while the coded accounting row remains distinct context. The cited project disclosure does not quantify this line’s environmental savings, annual output or separate revenue.

Factory construction balances include a wider accounting perimeter than individual line estimates

At 31 December 2009, all construction in progress carried CNY 839,647,136.25, compared with CNY 76,645,076.95 at the start of the year. The major-project table has a narrower perimeter: opening CNY 53,912,216.18, additions CNY 814,498,056.83 and transfers to fixed assets CNY 35,972,642.35 leave CNY 832,437,630.66 at year-end. A separate fixed-asset note reports CNY 56,993,170.11 transferred from construction, a broader total than the major-project table. Within the major table, Jiujiang new-factory construction opens at CNY 2,256,279.84, adds CNY 742,875,018.93 and transfers CNY 14,157,927.48, leaving CNY 730,973,371.29. Its reported investment-to-budget ratio is 37%, and special loans are named as the funding source. Management attributes part of the construction increase to relocation of existing Jiujiang assets as well as new construction. Additions therefore are not independently identified cash expenditure, and the broad factory row cannot be allocated between the two line components without a source bridge. The 37% ratio measures expenditure against budget, rather than physical completion or capacity utilization.

Reported construction opening balance / 2009 / all construction
RMB 76,645,076.95
Reported construction closing balance / 2009 / all construction
RMB 839,647,136.25
Reported construction opening balance / 2009 / major project table
RMB 53,912,216.18
Reported construction carrying-value additions / 2009 / major project table
RMB 814,498,056.83
Reported construction transfer to fixed assets / 2009 / major project table
RMB 35,972,642.35
Reported construction closing balance / 2009 / major project table
RMB 832,437,630.66
Reported construction transfer to fixed assets / 2009 / fixed asset note all construction
RMB 56,993,170.11
Reported project budget / 2009 / jiujiang new factory accounting row
RMB 1,970,249,330
Reported construction opening balance / 2009 / jiujiang new factory accounting row
RMB 2,256,279.84
Reported construction carrying-value additions / 2009 / jiujiang new factory accounting row
RMB 742,875,018.93
Reported construction transfer to fixed assets / 2009 / jiujiang new factory accounting row
RMB 14,157,927.48
Reported construction closing balance / 2009 / jiujiang new factory accounting row
RMB 730,973,371.29
Reported project investment budget ratio / 2009 / jiujiang new factory accounting row
37%

Coded construction projects and supporting equipment remain separately scoped

Project 224, described as a Tongxiang 30,000-tonne waste-fiber furnace, has a CNY 319,009,900 budget, CNY 12,682,896.75 of FY2009 additions and the same closing construction balance. The table reports investment at 4% of budget and own funds as the source. Project 222 has a CNY 117,624,500 budget, CNY 43,502,645.06 of additions and CNY 80,429,282.63 of closing construction, with a 68% investment-to-budget ratio and both special and general borrowing. Its code alone does not establish the site or product identity. Supporting works also include self-made fiber-drawing machines, with a CNY 67,900,000 budget and CNY 5,165,320 of additions and closing construction. Other disclosed closing balances include CNY 824,737.43 for a first-plant forehearth pure-oxygen upgrade and CNY 2,610,677.32 for a Jiujiang chopped-strand-mat project. These are construction accounting measures, not verified output, utilization or commissioning dates. A coded name is retained without creating a new physical project identity or merging it with a differently sized line.

Reported project budget / 2009 / 224 tongxiang 30kt waste fiber accounting row
RMB 319,009,900
Reported project construction additions / 2009 / 224 tongxiang 30kt waste fiber accounting row
RMB 12,682,896.75
Reported project construction closing balance / 2009 / 224 tongxiang 30kt waste fiber accounting row
RMB 12,682,896.75
Reported project budget / 2009 / 222 accounting row
RMB 117,624,500
Reported project construction additions / 2009 / 222 accounting row
RMB 43,502,645.06
Reported project construction closing balance / 2009 / 222 accounting row
RMB 80,429,282.63
Reported project budget / 2009 / self made drawing machines
RMB 67,900,000
Reported project construction additions / 2009 / self made drawing machines
RMB 5,165,320
Reported project construction closing balance / 2009 / self made drawing machines
RMB 5,165,320

Capitalized construction interest has project and period boundaries

The major-construction note reports cumulative capitalized interest of CNY 37,093,914.69 and current-year capitalized interest of CNY 36,962,507.19. Jiujiang new-factory construction accounts for CNY 33,662,726.93 in both columns and a reported capitalization rate of 5.94%. Project 222 accounts for cumulative CNY 3,431,187.76, of which CNY 3,299,780.26 belongs to the current year; its rate entry contains 5.4% and 7.47%. Current-year and cumulative amounts therefore differ for this row. These amounts are interest included in construction cost under the report accounting treatment, rather than all group interest expense or an independent measure of cash interest paid. The row-specific rates are not a consolidated effective borrowing rate. The table does not allocate this interest among the individual Jiujiang production lines.

Project developments in FY2009

Jiujiang 70,000-tonne component of the 2009 expansion

Open project history

The Jiujiang expansion began construction in July 2009. It comprised two alkali-free glass-fiber furnace-drawing lines with nominal annual capacities of 70,000 and 80,000 tonnes, plus supporting works for the new base. Furnace drawing means drawing glass into fibers from a molten-glass furnace. The 70,000-tonne component had an estimated total investment of CNY 981,259,600. The annual report says this line was ignited and entered production in February 2010. This is a subsequent event disclosed in the FY2009 report, rather than evidence of production throughout 2009. Management also described a larger 350,000-tonne base programme; that wider scope is not an additional operating capacity to add to these two components. Relocation of existing Jiujiang assets to the science and technology park also affected construction accounting. The disclosure does not separate this component’s annual output, utilization or customer sales.

Jiujiang 80,000-tonne component of the 2009 expansion

Open project history

The 80,000-tonne-per-year line was the second component of the Jiujiang 150,000-tonne alkali-free glass-fiber expansion. Its estimated total investment was CNY 991,753,800. The FY2009 investment discussion describes it as under construction. This stage is retained separately from the first component’s February 2010 production start. The two component estimates sum to CNY 1,973,013,400. The financial construction note instead gives the broader Jiujiang new-factory accounting row a budget of CNY 1,970,249,330. The CNY 2,764,070 difference has no reconciliation in these passages. Both source roles remain visible; the difference is not assigned to a line or treated as an overrun. Neither estimated total investment is identified as cash paid entirely during FY2009, and nominal capacity does not establish actual annual output.

Tongxiang 35,000-tonne environmental glass fiber line

Open project history

Construction of the Tongxiang energy-saving and environmental furnace-drawing line began in September 2009. The disclosed nominal annual capacity was 35,000 tonnes of glass fiber. The investment discussion estimates total investment at USD 73,511,800 and describes the project as under construction. The dollar currency in this individual disclosure is preserved. No assumed exchange rate is used to combine it with yuan project budgets. The financial construction note separately labels project 224 as a Tongxiang 30,000-tonne waste-fiber furnace. Shared location and environmental wording do not prove that the two names describe the same physical line. The 35,000-tonne project retains its existing identity while the coded accounting row remains distinct context. The cited project disclosure does not quantify this line’s environmental savings, annual output or separate revenue.

Read the complete annual research snapshot

Sources and scope

What this guide establishes

  • This page presents selected business disclosures from the FY2009 full annual report. It is not an exhaustive extraction of every disclosure.
  • Event dates stated in the text may differ from the reporting year. Later events disclosed before filing are identified explicitly; later annual reports are not inserted into this historical account.
  • The Chinese source was translated and compared with the cited pages in separate passes by the same assistant. Independent editorial review and publication approval remain pending.
  • Capacity, production, sales, project budgets and construction expenditure are different measures. Repairs and programme phases are not automatically incremental capacity.
  • This account covers historical identity and control, the downturn in sales and operating results, products and process development, commissioning and relocation, subsidiary and investment perimeters, customer and related-party relationships, cash and credit, funding, production tooling, tax, profit attribution, shareholder decisions, operating resources and assurance scope. The withdrawn Jushi Group merger application is explained from a separately identified issuer notice.
  • Source differences remain explicit: project budget presentations, cash restrictions and availability, comparative receivables and printed allowance percentages, share classifications, guarantee categories, parent statement signs and cents, and printed credit dates. These figures are not forced into an unsupported reconciliation.
  • The sources do not establish exact site coordinates, every permit or certificate, complete product specifications, every customer order or precise receipt dates where they are unspecified. Source-use basis and independent editorial review remain pending.
FY2009 full annual report ↗
Chinese / A-share / Chinese Accounting Standards / Published 2010-03-31
PDF SHA-256: ae5fdda5fdc0f57015e60fe2db5f5271792c23e7ed2be0e0f77c4d08dd16b202
FY2009 China Fiberglass: withdrawal of the Jushi Group share-swap merger application (announcement 2009-027) ↗
Chinese / Supplementary PDF / Retrieved 2026-10-07 / Publication date not assigned from document issue or website update date
PDF SHA-256: df251716cd4c5cc92ce3b01c97c6a07f7ec7a6ab179d80fe2d34ef59e4637a7c