SINOFILINGS / BUSINESS LIBRARY600176 / PUBLISHED
Project dossier / object-dossiers-v1

Jiujiang 70,000-tonne component of the 2009 expansion

Project / Background, reported developments and evidence

Selected disclosures assembled into a continuing object history. Associated business context retains its own company, product or site scope. Source-page links provide optional verification; the English account is intended to stand on its own.

Source reporting periods through 2010-12-31 / Company library through 2025-12-31
Content version 30 / deea6484e3c3 / PUBLISHED

At a glance

Record type
Project
Earliest source in this dossier
FY2009
Latest source in this dossier
FY2010
Company
China Jushi / 600176

Read the dated construction and operating milestones below. An installation stage or an engineering-progress percentage does not establish actual production. A programme and its component lines may describe the same capacity at different levels.

Location and identification

Exact physical address and coordinates have not yet been verified for this record.

Verified site coordinates: unavailable. No city-centre point is displayed as a plant location.

Reported measurements

Only measurements attached to this record are shown. Values retain their original reporting scope; rows are not summed into an asset total.

MeasureValuePeriod / scopeSource
Reported project total investmentRMB 981,259,6002010-01-01 to 2010-12-31jiujiang 70kt line reported total / jiujiang 70kt line reported totalFY2010, p. 21

The following sections retain the full available English descriptions and their source context. Associated business context describes its named product or base.

FY2010 / Disclosed developments

Open FY2010 company review

The Jiujiang programme was described as two furnace-drawing lines with nominal annual capacities of 70,000 and 80,000 tonnes, together forming the 150,000-tonne programme. The first, an alkali-free glass-fiber line operated by Jushi Jiujiang, entered production in February 2010. The investment table reports CNY 981,259,600 for this component, converted from CNY 98,125.96 in ten-thousand-yuan units. That reported total investment is not identified as cash paid entirely during FY2010. The component remains linked to its existing project record, rather than becoming a new project because the annual table groups it with the second line. Commissioning during the year does not mean the full nominal capacity was produced or sold that year; this passage supplies no line-specific annual output, utilization, customers or revenue. Its accounting identity must also be checked before attaching a broader factory-construction transfer to this line alone.

Reported project total investment / 2010 / jiujiang 70kt line reported total
RMB 981,259,600

FY2009 / Disclosed developments

Open FY2009 company review

The Jiujiang expansion began construction in July 2009. It comprised two alkali-free glass-fiber furnace-drawing lines with nominal annual capacities of 70,000 and 80,000 tonnes, plus supporting works for the new base. Furnace drawing means drawing glass into fibers from a molten-glass furnace. The 70,000-tonne component had an estimated total investment of CNY 981,259,600. The annual report says this line was ignited and entered production in February 2010. This is a subsequent event disclosed in the FY2009 report, rather than evidence of production throughout 2009. Management also described a larger 350,000-tonne base programme; that wider scope is not an additional operating capacity to add to these two components. Relocation of existing Jiujiang assets to the science and technology park also affected construction accounting. The disclosure does not separate this component’s annual output, utilization or customer sales.

Sources and scope

What this guide establishes

  • Reporting years identify the source filings. Actual event dates are retained in the text and may differ from the reporting year.
  • The latest disclosure year for this object is not confirmation of its current operating status. Coverage is selected, not an exhaustive account of every report.
  • Capacity, output, sales, construction progress and expenditure are separate measures. Programme and component capacities are not added together.
  • Company contact addresses are location leads. They do not establish exact plant boundaries or the footprint of individual projects.
FY2009 full annual report ↗
Chinese / A-share / Chinese Accounting Standards / Published 2010-03-31
PDF SHA-256: ae5fdda5fdc0f57015e60fe2db5f5271792c23e7ed2be0e0f77c4d08dd16b202
FY2010 full annual report ↗
Chinese / A-share / Chinese Accounting Standards / Published 2011-03-18
PDF SHA-256: 915a3f5d8123cd46cb97ff324ddfdb4df1604303bfc4b9c3030b8f5abdd7bdb8