Four expansion plans with distinct expected dates
The FY2007 report listed four non-fundraising investment projects with expected commissioning during 2008. Two were separately listed 140,000-tonne-per-year alkali-free glass-fiber tank-furnace drawing projects at Tongxiang: the first had a stated investment amount of CNY 1.6749234 billion and was expected to start production before the end of June 2008; the second had CNY 1.750087 billion and a deadline before the end of August 2008. Chengdu plans comprised a 40,000-tonne alkali-free line with imports of key equipment, CNY 488.6437 million and an expected start before the end of March 2008, and a 60,000-tonne medium-alkali line, CNY 611.781 million and an expected start before the end of July 2008. These source amounts describe the listed investment plans, rather than cash spent during FY2007. Their dates were expectations recorded in this report, not evidence of subsequent commissioning. The report does not assign line numbers to these four entries. The two similar Tongxiang descriptions are kept distinct, and the planned Chengdu 40,000-tonne project is not equated merely by capacity with the Chengdu project already described as commissioned in FY2007.