The narrative describes the second batch of 200,000-tonne lines within a 400,000-tonne manufacturing programme as entering production through staged ignition during FY2025. The batch and the whole programme are represented separately and their capacities must not be added together.
- Annual production capacity / 2025 / nominal line or batch
- 200,000 tonnes/year