Record type
Project
Earliest source in this dossier
FY2008
Latest source in this dossier
FY2008
Company
China Jushi / 600176

Read the dated construction and operating milestones below. An installation stage or an engineering-progress percentage does not establish actual production. A programme and its component lines may describe the same capacity at different levels.

Location and identification

Exact physical address and coordinates have not yet been verified for this record.

Verified site coordinates: unavailable. No city-centre point is displayed as a plant location.

The following sections retain the full available English descriptions and their source context. Associated business context describes its named product or base.

FY2008 / Disclosed developments

Open FY2008 company review

Tongxiang base line 4, an alkali-free tank-furnace drawing line with stated annual capacity of 140,000 tonnes, entered production in March 2008. The investment discussion describes the capacity as 60,000 plus 80,000 tonnes. Tongxiang line 5 had the same stated total capacity but entered production in July; the report identifies them as two distinct production lines.

Sources and scope

What this guide establishes

  • Reporting years identify the source filings. Actual event dates are retained in the text and may differ from the reporting year.
  • The latest disclosure year for this object is not confirmation of its current operating status. Coverage is selected, not an exhaustive account of every report.
  • Capacity, output, sales, construction progress and expenditure are separate measures. Programme and component capacities are not added together.
  • Company contact addresses are location leads. They do not establish exact plant boundaries or the footprint of individual projects.
FY2008 full annual report ↗
Chinese / A-share / Chinese Accounting Standards / Published 2009-02-10
PDF SHA-256: f1c0484a096c95b84c5c62fdc03e485f00d753586753659462e4a020dc20c799