Tongxiang 360,000-tonne programme: cold repair phase II

Project / Background, reported developments and evidence

Selected disclosures assembled into a continuing object history. Associated business context retains its own company, product or site scope. Source-page links provide optional verification; the English account is intended to stand on its own.

Source reporting periods through 2016-12-31 / Company library through 2025-12-31
Content version 30 / deea6484e3c3 / PUBLISHED

At a glance

Record type
Project
Earliest source in this dossier
FY2016
Latest source in this dossier
FY2016
Company
China Jushi / 600176

Read the dated construction and operating milestones below. An installation stage or an engineering-progress percentage does not establish actual production. A programme and its component lines may describe the same capacity at different levels.

Location and identification

Exact physical address and coordinates have not yet been verified for this record.

Verified site coordinates: unavailable. No city-centre point is displayed as a plant location.

Reported measurements

Only measurements attached to this record are shown. Values retain their original reporting scope; rows are not summed into an asset total.

MeasureValuePeriod / scopeSource
Project budgetRMB 554,195,0002016-12-31construction note / construction noteFY2016, p. 89
Construction in progress at year-endRMB 598,862,634.972016-12-31construction note / construction noteFY2016, p. 89
Issuer-reported investment-to-budget ratio58.03 percent2016-12-31construction note / construction noteFY2016, p. 89
Engineering progress80 percent2016-12-31construction note / construction noteFY2016, p. 89

The following sections retain the full available English descriptions and their source context. Associated business context describes its named product or base.

FY2016 / Disclosed developments

Open FY2016 company review

The second phase of the Tongxiang 360,000-tonne furnace-line cold-repair and upgrade programme was carried out in 2016. The report describes expected improvements in quality, capacity efficiency and costs. Phase II is stored as a distinct project phase, associated with the same base and wider programme as phase I. The programme's headline capacity is not added twice or interpreted as a newly commissioned line.

The 360,000-tonne furnace-drawing technical-upgrade programme has separate phase I and phase II rows in the construction note. Phase II reports a budget of CNY 554,195,000.00, additions and year-end construction of CNY 598,862,634.97, a reported investment-to-budget ratio of 58.03% and engineering progress of 80%. The monetary balance divided by the printed budget does not reproduce the printed ratio. Phase I has a budget of CNY 494,099,600.00, reported investment ratio of 45.40% and engineering progress of 100%; its closing construction cell is blank after the disclosed transfers and other reductions. These source values are preserved without changing the budgets or equating engineering completion with full commercial utilization. A further narrative describes upgrading two 140,000-tonne lines to 180,000 tonnes each, a combined investment of 104,829.46 ten-thousand CNY and a two-year construction period starting in the fourth quarter of 2015. Its combined investment equals the two printed phase budgets, and the two resulting capacities total the programme headline. Those correspondences support comparison, but do not allocate every narrative milestone or cost to a particular phase, nor identify this programme with the separate intelligent-base groundbreaking.

Project budget / 2016 / construction note
RMB 554,195,000
Construction in progress at year-end / 2016 / construction note
RMB 598,862,634.97
Issuer-reported investment-to-budget ratio / 2016 / construction note
58.03 percent
Engineering progress / 2016 / construction note
80 percent

Sources and scope

What this guide establishes

  • Reporting years identify the source filings. Actual event dates are retained in the text and may differ from the reporting year.
  • The latest disclosure year for this object is not confirmation of its current operating status. Coverage is selected, not an exhaustive account of every report.
  • Capacity, output, sales, construction progress and expenditure are separate measures. Programme and component capacities are not added together.
  • Company contact addresses are location leads. They do not establish exact plant boundaries or the footprint of individual projects.