The engineering table identifies an electrical-assisted melting upgrade for line 308, with CNY 13,519,340.00 of budget, CNY 134,219,074.48 closing construction in progress, 90% engineering progress and a reported investment-to-budget ratio of 10.5%. The closing balance is much larger than the printed budget, so these measures do not supply a consistent investment reconciliation. The same figures appear in the original image; the budget is not silently multiplied by ten or replaced with an inferred amount. The separate construction-balance table corroborates the closing amount. This is a named line upgrade rather than evidence of a new standalone factory or disclosed additional fiber tonnage. The annual report gives no exact site address, coordinates, measured energy saving or final completion date for this row. A line identifier and a shared melting technology are insufficient to merge it with another furnace, cold-repair activity or site. The original source values and unresolved perimeter are retained for later-period comparison.
- Project budget / 2014 / reported engineering row
- RMB 13,519,340
- Construction in progress at year-end / 2014 / closing cip table
- RMB 134,219,074.48
- Reported investment-to-budget ratio / 2014 / reported engineering row
- 10.5 percent
- Engineering progress / 2014 / reported engineering row
- 90 percent