Jushi Group 100,000-tonne line energy-saving upgrade (2014 disclosure)

Project / Background, reported developments and evidence

Selected disclosures assembled into a continuing object history. Associated business context retains its own company, product or site scope. Source-page links provide optional verification; the English account is intended to stand on its own.

Source reporting periods through 2014-12-31 / Company library through 2025-12-31
Content version 30 / deea6484e3c3 / PUBLISHED

At a glance

Record type
Project
Earliest source in this dossier
FY2014
Latest source in this dossier
FY2014
Company
China Jushi / 600176

Read the dated construction and operating milestones below. An installation stage or an engineering-progress percentage does not establish actual production. A programme and its component lines may describe the same capacity at different levels.

Location and identification

Exact physical address and coordinates have not yet been verified for this record.

Verified site coordinates: unavailable. No city-centre point is displayed as a plant location.

Reported measurements

Only measurements attached to this record are shown. Values retain their original reporting scope; rows are not summed into an asset total.

MeasureValuePeriod / scopeSource
Designed annual fiber capacity120,000 tonnes/year2014-12-31upgraded line design / upgraded line designFY2014, p. 121

The following sections retain the full available English descriptions and their source context. Associated business context describes its named product or base.

FY2014 / Disclosed developments

Open FY2014 company review

Jushi Group's original 100,000-tonne-per-year alkali-free glass-fiber line underwent cold repair and an energy-efficiency upgrade. The financial project note says that the rebuilt line had a design capacity of 120,000 tonnes per year for high-performance glass fiber. Construction started in May 2014 and was completed in October 2014. Its investment budget was 20,002.27 ten-thousand CNY, matching the 100,000-tonne upgrade in the board-report investment table; funding combined own funds and bank borrowing. The investment table reports both current-year and cumulative investment of 19,776.55 ten-thousand CNY and a completed status. Those existing budget and investment facts are reused rather than duplicated. The disclosed change is from a 100,000-tonne design to a 120,000-tonne design, an increase of 20,000 tonnes per year in nameplate capability. It is not evidence of an entirely additional 120,000-tonne line, actual annual production or utilization. The note gives no physical address or coordinates, and the project is not merged with the separately recorded 120,000-tonne upgrade merely because their reported capacities match.

Designed annual fiber capacity / 2014 / upgraded line design
120,000 tonnes/year

Sources and scope

What this guide establishes

  • Reporting years identify the source filings. Actual event dates are retained in the text and may differ from the reporting year.
  • The latest disclosure year for this object is not confirmation of its current operating status. Coverage is selected, not an exhaustive account of every report.
  • Capacity, output, sales, construction progress and expenditure are separate measures. Programme and component capacities are not added together.
  • Company contact addresses are location leads. They do not establish exact plant boundaries or the footprint of individual projects.