The Jiujiang 30,000-tonne environmental alkali-free glass-fiber furnace line was ignited and entered production on 20 June 2006. The narrative reports a 176-day construction period, 19,300 square metres of building area and CNY 250 million of investment; the project-specific investment section separately reports CNY 254 million. The source does not reconcile those amounts. The construction note identifies the Jiujiang 30,000-tonne furnace line and records CNY 228.095 million transferred to fixed assets with no closing construction balance. This is not a substitute for total investment or annual cash expenditure. Management separately describes technology for furnaces using waste glass-fiber strands as feedstock; the environmental label does not itself establish emissions, recycling yield or site-wide environmental performance. The 30,000-tonne expansion is kept distinct from the older 10,000-tonne Jiujiang line.
At a glance
- Record type
- Project
- Earliest source in this dossier
- FY2005
- Latest source in this dossier
- FY2006
- Company
- China Jushi / 600176
Read the dated construction and operating milestones below. An installation stage or an engineering-progress percentage does not establish actual production. A programme and its component lines may describe the same capacity at different levels.
Location and identification
Exact physical address and coordinates have not yet been verified for this record.
Verified site coordinates: unavailable. No city-centre point is displayed as a plant location.
The following sections retain the full available English descriptions and their source context. Associated business context describes its named product or base.
FY2006 / Disclosed developments
FY2005 / Disclosed developments
The same investment programme approved a 30,000-tonne annual-capacity alkali-free tank-furnace drawing line at Jiujiang, with production expected in the third quarter of 2006. Jushi Group held 99% of Jiujiang in the cited ownership discussion. Capacity, chemistry and the approval period identify this as a further Jiujiang project; it is not merged with the older 10,000-tonne environmental line merely because both were built at the same base.
Sources and scope
What this guide establishes
- Reporting years identify the source filings. Actual event dates are retained in the text and may differ from the reporting year.
- The latest disclosure year for this object is not confirmation of its current operating status. Coverage is selected, not an exhaustive account of every report.
- Capacity, output, sales, construction progress and expenditure are separate measures. Programme and component capacities are not added together.
- Company contact addresses are location leads. They do not establish exact plant boundaries or the footprint of individual projects.
Chinese / A-share / Chinese Accounting Standards / Published 2006-04-15
PDF SHA-256: ff25fa38cb8e790533f1037e6c6655fd45ea84820c1b7c5eccd4ffc1697ab8a2
Chinese / A-share / Chinese Accounting Standards / Published 2007-04-12
PDF SHA-256: 476dbc0ea36f08137f89d4e316f94a0a71877f9ac12ef3672c71bd63c0306cf9