The Jiujiang120,000-tonne-per-year alkali-free line had a CNY 1,012,953,900.00 budget, CNY 729,777,613.75 of annual construction additions, CNY 953,647,657.04 transferred to fixed assets and CNY 14,540,162.45 remaining in construction. The schedule reports95.00% engineering progress and CNY 2,357,472.23 of annual capitalized interest. A different30,000-tonne upgrade project transferred CNY 139,903,706.36 to fixed assets and reclassified CNY 59,669,675.17 into the120,000-tonne project. This is an explicit account reclassification, not an additional cash payment or another new line. The receiving schedule does not separately bridge that reclassification against all its additions. The operating narrative's350,000-tonne regional layout is broader than this new line and should not replace its capacity. Existing project identities are retained.
- Jiujiang120kt line budget / 2018 / FY2018 A share/CAS. Named120kt line, except explicitly identified separate30kt upgrade movements; not extra output.
- RMB 1,012,953,900
- Jiujiang120kt construction additions / 2018 / FY2018 A share/CAS. Named120kt line, except explicitly identified separate30kt upgrade movements; not extra output.
- RMB 729,777,613.75
- Jiujiang120kt transfers to PPE / 2018 / FY2018 A share/CAS. Named120kt line, except explicitly identified separate30kt upgrade movements; not extra output.
- RMB 953,647,657.04
- Jiujiang120kt closing construction / 2018 / FY2018 A share/CAS. Named120kt line, except explicitly identified separate30kt upgrade movements; not extra output.
- RMB 14,540,162.45
- Jiujiang120kt annual capitalized interest / 2018 / FY2018 A share/CAS. Named120kt line, except explicitly identified separate30kt upgrade movements; not extra output.
- RMB 2,357,472.23
- Separate Jiujiang30kt upgrade transfers to PPE / 2018 / FY2018 A share/CAS. Named120kt line, except explicitly identified separate30kt upgrade movements; not extra output.
- RMB 139,903,706.36
- Separate30kt upgrade reclassified into120kt account / 2018 / FY2018 A share/CAS. Named120kt line, except explicitly identified separate30kt upgrade movements; not extra output.
- RMB 59,669,675.17
- Jiujiang120kt engineering progress / 2018 / FY2018 A share/CAS.
- 95 percent
At Jiujiang, three older lines underwent cold repair and upgrading, while a new 120,000-tonne-per-year line was built. The discussion describes a 350,000-tonne production layout in the central region. Repairs to existing furnaces, a new line and the base-wide capacity layout are different scopes. The base-wide figure is not interpreted as the capacity of the new line alone.
- Annual production capacity
- 120,000 tonnes/year