Jiujiang 120,000-tonne line in the 2018 base programme

Project / Background, reported developments and evidence

Selected disclosures assembled into a continuing object history. Associated business context retains its own company, product or site scope. Source-page links provide optional verification; the English account is intended to stand on its own.

Source reporting periods through 2018-12-31 / Company library through 2025-12-31
Content version 30 / deea6484e3c3 / PUBLISHED

At a glance

Record type
Project
Earliest source in this dossier
FY2018
Latest source in this dossier
FY2018
Company
China Jushi / 600176

Read the dated construction and operating milestones below. An installation stage or an engineering-progress percentage does not establish actual production. A programme and its component lines may describe the same capacity at different levels.

Location and identification

Exact physical address and coordinates have not yet been verified for this record.

Verified site coordinates: unavailable. No city-centre point is displayed as a plant location.

Reported measurements

Only measurements attached to this record are shown. Values retain their original reporting scope; rows are not summed into an asset total.

MeasureValuePeriod / scopeSource
Jiujiang120kt line budgetRMB 1,012,953,9002018-12-31FY2018 A share/CAS. Named120kt line, except explicitly identified separate30kt upgrade movements; not extra output. / jiujiang budget fy2018 disclosureFY2018, p. 109
Jiujiang120kt construction additionsRMB 729,777,613.752018-01-01 to 2018-12-31FY2018 A share/CAS. Named120kt line, except explicitly identified separate30kt upgrade movements; not extra output. / jiujiang add fy2018 disclosureFY2018, p. 109
Jiujiang120kt transfers to PPERMB 953,647,657.042018-01-01 to 2018-12-31FY2018 A share/CAS. Named120kt line, except explicitly identified separate30kt upgrade movements; not extra output. / jiujiang transfer fy2018 disclosureFY2018, p. 109
Jiujiang120kt closing constructionRMB 14,540,162.452018-12-31FY2018 A share/CAS. Named120kt line, except explicitly identified separate30kt upgrade movements; not extra output. / jiujiang cip fy2018 disclosureFY2018, p. 109
Jiujiang120kt annual capitalized interestRMB 2,357,472.232018-01-01 to 2018-12-31FY2018 A share/CAS. Named120kt line, except explicitly identified separate30kt upgrade movements; not extra output. / jiujiang cap interest fy2018 disclosureFY2018, p. 109
Separate Jiujiang30kt upgrade transfers to PPERMB 139,903,706.362018-01-01 to 2018-12-31FY2018 A share/CAS. Named120kt line, except explicitly identified separate30kt upgrade movements; not extra output. / jiujiang30 transfer fy2018 disclosureFY2018, p. 109
Separate30kt upgrade reclassified into120kt accountRMB 59,669,675.172018-01-01 to 2018-12-31FY2018 A share/CAS. Named120kt line, except explicitly identified separate30kt upgrade movements; not extra output. / jiujiang30 reclass fy2018 disclosureFY2018, p. 110
Jiujiang120kt engineering progress95 percent2018-12-31FY2018 A share/CAS. / jiujiang progress fy2018 disclosureFY2018, p. 109
Annual production capacity120,000 tonnes/yearFY2018 filing; value date not structuredglass fiberFY2018, p. 14

The following sections retain the full available English descriptions and their source context. Associated business context describes its named product or base.

FY2018 / Disclosed developments

Open FY2018 company review

The Jiujiang120,000-tonne-per-year alkali-free line had a CNY 1,012,953,900.00 budget, CNY 729,777,613.75 of annual construction additions, CNY 953,647,657.04 transferred to fixed assets and CNY 14,540,162.45 remaining in construction. The schedule reports95.00% engineering progress and CNY 2,357,472.23 of annual capitalized interest. A different30,000-tonne upgrade project transferred CNY 139,903,706.36 to fixed assets and reclassified CNY 59,669,675.17 into the120,000-tonne project. This is an explicit account reclassification, not an additional cash payment or another new line. The receiving schedule does not separately bridge that reclassification against all its additions. The operating narrative's350,000-tonne regional layout is broader than this new line and should not replace its capacity. Existing project identities are retained.

Jiujiang120kt line budget / 2018 / FY2018 A share/CAS. Named120kt line, except explicitly identified separate30kt upgrade movements; not extra output.
RMB 1,012,953,900
Jiujiang120kt construction additions / 2018 / FY2018 A share/CAS. Named120kt line, except explicitly identified separate30kt upgrade movements; not extra output.
RMB 729,777,613.75
Jiujiang120kt transfers to PPE / 2018 / FY2018 A share/CAS. Named120kt line, except explicitly identified separate30kt upgrade movements; not extra output.
RMB 953,647,657.04
Jiujiang120kt closing construction / 2018 / FY2018 A share/CAS. Named120kt line, except explicitly identified separate30kt upgrade movements; not extra output.
RMB 14,540,162.45
Jiujiang120kt annual capitalized interest / 2018 / FY2018 A share/CAS. Named120kt line, except explicitly identified separate30kt upgrade movements; not extra output.
RMB 2,357,472.23
Separate Jiujiang30kt upgrade transfers to PPE / 2018 / FY2018 A share/CAS. Named120kt line, except explicitly identified separate30kt upgrade movements; not extra output.
RMB 139,903,706.36
Separate30kt upgrade reclassified into120kt account / 2018 / FY2018 A share/CAS. Named120kt line, except explicitly identified separate30kt upgrade movements; not extra output.
RMB 59,669,675.17
Jiujiang120kt engineering progress / 2018 / FY2018 A share/CAS.
95 percent

At Jiujiang, three older lines underwent cold repair and upgrading, while a new 120,000-tonne-per-year line was built. The discussion describes a 350,000-tonne production layout in the central region. Repairs to existing furnaces, a new line and the base-wide capacity layout are different scopes. The base-wide figure is not interpreted as the capacity of the new line alone.

Annual production capacity
120,000 tonnes/year

Sources and scope

What this guide establishes

  • Reporting years identify the source filings. Actual event dates are retained in the text and may differ from the reporting year.
  • The latest disclosure year for this object is not confirmation of its current operating status. Coverage is selected, not an exhaustive account of every report.
  • Capacity, output, sales, construction progress and expenditure are separate measures. Programme and component capacities are not added together.
  • Company contact addresses are location leads. They do not establish exact plant boundaries or the footprint of individual projects.