The Jiujiang upgrade used Jushi Group's established 10,000-tonne-per-year alkali-free glass-fiber tank-furnace drawing technology. The report says construction was completed and the furnace ignited on 6 April 2003, followed by formal production on 28 May. Management reports that the line reached its design production capacity during the month of commissioning. This is a management statement about the startup month, not a disclosed measurement of full-year production, sales or sustained annual utilisation. The report calls the line environmental, but this description alone does not quantify energy use or emissions. The project retains its link to the Jiujiang construction-stage disclosure in 2002, while the 2003 commissioning is a separate dated observation.
At a glance
- Record type
- Project
- Earliest source in this dossier
- FY2002
- Latest source in this dossier
- FY2003
- Company
- China Jushi / 600176
Read the dated construction and operating milestones below. An installation stage or an engineering-progress percentage does not establish actual production. A programme and its component lines may describe the same capacity at different levels.
Location and identification
Exact physical address and coordinates have not yet been verified for this record.
Verified site coordinates: unavailable. No city-centre point is displayed as a plant location.
Reported measurements
Only measurements attached to this record are shown. Values retain their original reporting scope; rows are not summed into an asset total.
| Measure | Value | Period / scope | Source |
|---|---|---|---|
| Annual production capacity | 10,000 tonnes/year | FY2002 filing; value date not structuredglass fiber | FY2002, p. 14 |
The following sections retain the full available English descriptions and their source context. Associated business context describes its named product or base.
FY2003 / Disclosed developments
FY2002 / Disclosed developments
The 10,000-tonne environmental alkali-free glass fiber project at Jiujiang used Jushi's proprietary technology for returning waste fiber to the furnace. Construction had formally started. Year-end investment was RMB 25.3892 million; civil work on the main workshop and supporting works was under way, together with equipment ordering and technical training. These details describe the technology, scale and construction stage. They do not establish a commissioning date in the 2002 reporting period.
- Annual production capacity
- 10,000 tonnes/year
Sources and scope
What this guide establishes
- Reporting years identify the source filings. Actual event dates are retained in the text and may differ from the reporting year.
- The latest disclosure year for this object is not confirmation of its current operating status. Coverage is selected, not an exhaustive account of every report.
- Capacity, output, sales, construction progress and expenditure are separate measures. Programme and component capacities are not added together.
- Company contact addresses are location leads. They do not establish exact plant boundaries or the footprint of individual projects.
Chinese / A-share / Chinese Accounting Standards / Published 2003-03-29
PDF SHA-256: d999bbd22cd37c97d1252b39a449188eea71f8a79efddb2cff4f93d5a68e0af3
Chinese / A-share / Chinese Accounting Standards / Published 2004-04-06
PDF SHA-256: 4d3e45fbe84261ca518a26d6d081e4da25ba77445bfd7539f7f74bc16e95cca4