SINOFILINGS / BUSINESS LIBRARY600176 / PUBLISHED
Project dossier / object-dossiers-v1

Huai'an 500 MW wind-power construction project

Project / Background, reported developments and evidence

Selected disclosures assembled into a continuing object history. Associated business context retains its own company, product or site scope. Source-page links provide optional verification; the English account is intended to stand on its own.

Source reporting periods through 2025-12-31 / Company library through 2025-12-31
Content version 30 / deea6484e3c3 / PUBLISHED

At a glance

Record type
Project
Earliest source in this dossier
FY2024
Latest source in this dossier
FY2025
Company
China Jushi / 600176

Recorded English aliases: On February 9, 2025, China Jushi launched the construction for the second phase

Read the dated construction and operating milestones below. An installation stage or an engineering-progress percentage does not establish actual production. A programme and its component lines may describe the same capacity at different levels.

Identity and scope to resolve

The 200 MW supporting-wind entry in the financial note and the 500 MW wind construction project in the narrative have different disclosed scopes. A common Huai'an association does not resolve whether one is a component of the other. They remain separate records.

Compare related record

Location and identification

Exact physical address and coordinates have not yet been verified for this record.

Verified site coordinates: unavailable. No city-centre point is displayed as a plant location.

Connected operating records

These associations are supported by the cited disclosure. A programme or base association does not establish a shared physical footprint.

The following sections retain the full available English descriptions and their source context. Associated business context describes its named product or base.

FY2025 / Disclosed developments

Open FY2025 company review

The 2025 annual report said the Huai'an 500 MW wind-power project formally started construction by the end of 2025. This is a separate milestone from installation of the electronic-yarn line.

FY2024 / Disclosed developments

Open FY2024 company review

The 2024 annual report describes a 500 MW wind-power construction project as supporting the Huai'an 100,000-tonne electronic-grade glass fiber line.

Sources and scope

What this guide establishes

  • Reporting years identify the source filings. Actual event dates are retained in the text and may differ from the reporting year.
  • The latest disclosure year for this object is not confirmation of its current operating status. Coverage is selected, not an exhaustive account of every report.
  • Capacity, output, sales, construction progress and expenditure are separate measures. Programme and component capacities are not added together.
  • Company contact addresses are location leads. They do not establish exact plant boundaries or the footprint of individual projects.
FY2024 full annual report ↗
Chinese / A-share / Chinese Accounting Standards / Published 2025-03-20
PDF SHA-256: 6a70135e3651e1c5aac041ed072d4a8182d54ea459a9321d521de9731c983284
FY2025 full annual report ↗
Chinese / A-share / Chinese Accounting Standards / Published 2026-03-20
PDF SHA-256: c71b2130cf3d5d9135b884f732d06767c6d2de03c6f7563920a2fc19ef73347f