Phase I of the Huai'an Lianshui base was fully launched and was entering the critical installation stage. A supporting wind-power project progressed at the same time. The passage does not declare the base fully commissioned in 2023. It links the manufacturing and renewable-power investments but does not make them one physical asset or identify the wind project as the later 500 MW project.
At a glance
- Record type
- Project
- Earliest source in this dossier
- FY2022
- Latest source in this dossier
- FY2023
- Company
- China Jushi / 600176
Read the dated construction and operating milestones below. An installation stage or an engineering-progress percentage does not establish actual production. A programme and its component lines may describe the same capacity at different levels.
Location and identification
Exact physical address and coordinates have not yet been verified for this record.
Verified site coordinates: unavailable. No city-centre point is displayed as a plant location.
The following sections retain the full available English descriptions and their source context. Associated business context describes its named product or base.
FY2023 / Disclosed developments
FY2022 / Disclosed developments
The report records establishment of a Huai'an subsidiary and the start of a proposed zero-carbon intelligent glass fiber manufacturing base. The location summary separately identifies Huai'an as under construction. This is the start of a new domestic base, distinct from a later electronic-yarn line and its separate wind-power project. Zero-carbon is the company's project description, not an independent life-cycle emissions certification established here.
Sources and scope
What this guide establishes
- Reporting years identify the source filings. Actual event dates are retained in the text and may differ from the reporting year.
- The latest disclosure year for this object is not confirmation of its current operating status. Coverage is selected, not an exhaustive account of every report.
- Capacity, output, sales, construction progress and expenditure are separate measures. Programme and component capacities are not added together.
- Company contact addresses are location leads. They do not establish exact plant boundaries or the footprint of individual projects.
Chinese / A-share / Chinese Accounting Standards / Published 2023-03-21
PDF SHA-256: 96f4ef3e82dabc79b499e469a1631b2c73de628c0343a783defe2a110afe0c4b
Chinese / A-share / Chinese Accounting Standards / Published 2024-03-20
PDF SHA-256: 5eec3137d10335ca19b58187a5660b51180f8448c1e56330c3b39394b4d784f1