The FY2025 construction note retains the same Huai'an implementing company, 400,000-tonne high-performance-fiber designation and RMB 4,672,868,700 budget. It reports 80% engineering progress and RMB 254,160,966.78 remaining in construction-in-progress, distinct from the electronic line's 60% progress. The programme's cumulative-spending-to-budget ratio is 71.82%, compared with 72.52% in the prior filing. This ratio should not be substituted for engineering progress or forced into a monotonically increasing series; the reports do not explain the ratio difference.
The FY2025 important-construction-project note reports a budget of RMB 4,672,868,700.00 and engineering progress of 80% for this project. The closing construction-in-progress balance is RMB 254,160,966.78. Engineering progress, spending against budget, and actual output are different measures. A blank closing cell is retained as a blank and is not entered as a numeric zero.
- Project budget / 2025 / project disclosed
- RMB 4,672,868,700
- Engineering progress / 2025 / project disclosed
- 80%
- Construction in progress at year-end / 2025 / project disclosed
- RMB 254,160,966.78