Chengdu packaging-material workshop upgrade

Project / Background, reported developments and evidence

Selected disclosures assembled into a continuing object history. Associated business context retains its own company, product or site scope. Source-page links provide optional verification; the English account is intended to stand on its own.

Source reporting periods through 2014-12-31 / Company library through 2025-12-31
Content version 30 / deea6484e3c3 / PUBLISHED

At a glance

Record type
Project
Earliest source in this dossier
FY2012
Latest source in this dossier
FY2014
Company
China Jushi / 600176

Read the dated construction and operating milestones below. An installation stage or an engineering-progress percentage does not establish actual production. A programme and its component lines may describe the same capacity at different levels.

Location and identification

Exact physical address and coordinates have not yet been verified for this record.

Verified site coordinates: unavailable. No city-centre point is displayed as a plant location.

Reported measurements

Only measurements attached to this record are shown. Values retain their original reporting scope; rows are not summed into an asset total.

MeasureValuePeriod / scopeSource
Project budgetRMB 79,900,0002014-12-31packaging workshop upgrade / packaging workshop upgradeFY2014, p. 13
Annual project investmentRMB 12,240,0002014-01-01 to 2014-12-31packaging workshop upgrade / packaging workshop upgradeFY2014, p. 13
Cumulative project investmentRMB 68,210,0002014-12-31packaging workshop upgrade / packaging workshop upgradeFY2014, p. 13
Annual construction additionsRMB 12,425,835.862014-01-01 to 2014-12-31reported engineering row / reported engineering rowFY2014, p. 90
Project transfer to fixed assetsRMB 32,764,179.662014-01-01 to 2014-12-31reported engineering row / reported engineering rowFY2014, p. 90
Construction in progress at year-endRMB 35,627,184.882014-12-31closing cip table / closing cip tableFY2014, p. 88
Engineering progress85.6 percent2014-12-31reported engineering row / reported engineering rowFY2014, p. 90
Reported cip additionsRMB 26,705,759.712013-01-01 to 2013-12-31chengdu packaging workshop / chengdu packaging workshopFY2013, p. 94
Reported cip netRMB 55,965,528.682013-12-31chengdu packaging workshop / chengdu packaging workshopFY2013, p. 93
Project budgetRMB 79,900,0002012-12-31management packaging table / management packaging tableFY2012, p. 16
Reported project annual investmentRMB 29,260,0002012-01-01 to 2012-12-31management packaging table / management packaging tableFY2012, p. 16
Reported project cumulative investmentRMB 29,260,0002012-12-31management packaging to date / management packaging to dateFY2012, p. 16

The following sections retain the full available English descriptions and their source context. Associated business context describes its named product or base.

FY2014 / Disclosed developments

Open FY2014 company review

The project table identifies an upgrade to the packaging-material workshop of Jushi Group Chengdu. It gives a project amount of 7,990 ten-thousand CNY, annual investment of 1,224 ten-thousand CNY and cumulative investment of 6,821 ten-thousand CNY, and marks the project unfinished. This is a packaging-support project, not an additional glass-fiber furnace or a stated increment of yarn capacity. The table does not give a physical address, completion date, workshop output or savings. A separate project identity preserves the disclosed operator and activity without merging it into the Chengdu 50,000-tonne upgrade or 60,000-tonne conversion merely because they share a city.

Project budget / 2014 / packaging workshop upgrade
RMB 79,900,000
Annual project investment / 2014 / packaging workshop upgrade
RMB 12,240,000
Cumulative project investment / 2014 / packaging workshop upgrade
RMB 68,210,000

The Chengdu packaging-material workshop upgrade remained unfinished in the board investment table. Its budget of 7,990 ten-thousand CNY matches the CNY 79,900,000.00 engineering budget. The engineering table reports current additions of CNY 12,425,835.86, CNY 32,764,179.66 transferred to fixed assets, closing construction in progress of CNY 35,627,184.88 and 85.6% engineering progress. The board table separately gives current investment of 1,224 ten-thousand CNY and cumulative investment of 6,821 ten-thousand CNY. The source does not provide a complete bridge between the two annual investment measures. A closing construction balance is neither total spending since project inception nor the same as equipment already transferred to fixed assets. Packaging is supporting activity, not a newly disclosed glass-fiber furnace or a tonnage addition. The existing board budget and investment fields remain, while engineering figures keep their separate scope and evidence. No warehouse-equipment prepayment or finance-lease deposit is automatically assigned to this project merely because it also supports production.

Annual construction additions / 2014 / reported engineering row
RMB 12,425,835.86
Project transfer to fixed assets / 2014 / reported engineering row
RMB 32,764,179.66
Construction in progress at year-end / 2014 / closing cip table
RMB 35,627,184.88
Engineering progress / 2014 / reported engineering row
85.6 percent

FY2013 / Disclosed developments

Open FY2013 company review

Jushi Group Chengdu's packaging-material workshop upgrade was unfinished and under construction. The management table reports a CNY 79,900,000 project amount, rounded annual investment of CNY 26,710,000 and cumulative investment of CNY 55,970,000. The financial construction ledger identifies the same Chengdu packaging-material upgrade and gives CNY 26,705,759.71 of current additions and CNY 55,965,528.68 of closing construction in progress. The latter also reconciles to the opening balance of CNY 29,259,768.97 plus current additions. These precise amounts are consistent with rounding to the management table's CNY 10,000 unit; they are not extra cash expenditure. The project is linked to the existing packaging-workshop entity also described in FY 2014, based on implementing company, workshop scope and the same budget. The legacy entity key contains 2014 but does not claim that the project began that year. Packaging infrastructure is kept distinct from a new glass-fiber furnace; neither extra fiber tonnage nor a measured productivity benefit is disclosed here.

Reported cip additions / 2013 / chengdu packaging workshop
RMB 26,705,759.71
Reported cip net / 2013 / chengdu packaging workshop
RMB 55,965,528.68

FY2012 / Disclosed developments

Open FY2012 company review

The Chengdu packaging-material workshop upgrade was still under construction at year end. The investment summary reports a CNY 79,900,000 project amount and CNY 29,260,000 invested both during FY2012 and cumulatively. The implementing company and packaging-workshop description identify the existing project used in the later annual accounts, without relying only on the amount. The financial note separately names support works for a 130,000-tonne glass-fiber line, with a CNY 79,900,000 budget, CNY 29,259,768.97 closing balance and 40% reported progress. The close amounts provide a comparison reference but do not prove that every supporting-work item belongs to the packaging workshop. The source-specific accounting row remains separately scoped. A packaging workshop or support-work reference is not itself evidence that 130,000 tonnes of new fiber capacity was installed, nor that either project had completed or generated a measured sales benefit.

Project budget / 2012 / management packaging table
RMB 79,900,000
Reported project annual investment / 2012 / management packaging table
RMB 29,260,000
Reported project cumulative investment / 2012 / management packaging to date
RMB 29,260,000

Sources and scope

What this guide establishes

  • Reporting years identify the source filings. Actual event dates are retained in the text and may differ from the reporting year.
  • The latest disclosure year for this object is not confirmation of its current operating status. Coverage is selected, not an exhaustive account of every report.
  • Capacity, output, sales, construction progress and expenditure are separate measures. Programme and component capacities are not added together.
  • Company contact addresses are location leads. They do not establish exact plant boundaries or the footprint of individual projects.
FY2012 full annual report ↗
Chinese / A-share / Chinese Accounting Standards / Published 2013-03-15
PDF SHA-256: 38205fabda3454f131412e84de42b1d18aac6e5d88dfb3cc0bafacebef394f7e
FY2013 full annual report ↗
Chinese / A-share / Chinese Accounting Standards / Published 2014-03-19
PDF SHA-256: 95d20729281439b11b9ef2fe5f86ca19007a1f9d5b239ced1aedce9aad8128c3
FY2014 full annual report ↗
Chinese / A-share / Chinese Accounting Standards / Published 2015-03-18
PDF SHA-256: 9651c42a65e7a7d89ad49652e39914807223f94f462ee75c8e8522e293c2741a