SINOFILINGS / BUSINESS LIBRARY600176 / PUBLISHED
Project dossier / object-dossiers-v1

Chengdu line 3, 40,000 tonnes per year

Project / Background, reported developments and evidence

Selected disclosures assembled into a continuing object history. Associated business context retains its own company, product or site scope. Source-page links provide optional verification; the English account is intended to stand on its own.

Source reporting periods through 2008-12-31 / Company library through 2025-12-31
Content version 30 / deea6484e3c3 / PUBLISHED

At a glance

Record type
Project
Earliest source in this dossier
FY2008
Latest source in this dossier
FY2008
Company
China Jushi / 600176

Read the dated construction and operating milestones below. An installation stage or an engineering-progress percentage does not establish actual production. A programme and its component lines may describe the same capacity at different levels.

Location and identification

Exact physical address and coordinates have not yet been verified for this record.

Verified site coordinates: unavailable. No city-centre point is displayed as a plant location.

The following sections retain the full available English descriptions and their source context. Associated business context describes its named product or base.

FY2008 / Disclosed developments

Open FY2008 company review

Chengdu base line 3, a 40,000-tonne alkali-free glass fiber tank-furnace drawing line, entered production in January 2008. It differs in product chemistry, line identifier and commissioning period from the earlier 40,000-tonne medium-alkali Chengdu project. The stated annual capacity describes the line's design scale; the source does not provide a separate full-year output or sales figure for this line.

Sources and scope

What this guide establishes

  • Reporting years identify the source filings. Actual event dates are retained in the text and may differ from the reporting year.
  • The latest disclosure year for this object is not confirmation of its current operating status. Coverage is selected, not an exhaustive account of every report.
  • Capacity, output, sales, construction progress and expenditure are separate measures. Programme and component capacities are not added together.
  • Company contact addresses are location leads. They do not establish exact plant boundaries or the footprint of individual projects.
FY2008 full annual report ↗
Chinese / A-share / Chinese Accounting Standards / Published 2009-02-10
PDF SHA-256: f1c0484a096c95b84c5c62fdc03e485f00d753586753659462e4a020dc20c799