The second phase of the Chengdu 140,000-tonne furnace-drawing technical-upgrade programme was carried out alongside Tongxiang repair work. Its phase and base distinguish it from the earlier Chengdu work and from the Tongxiang programme. The passage presents anticipated quality and operating improvements. It does not provide an independent incremental-capacity figure for this phase.
At a glance
- Record type
- Project
- Earliest source in this dossier
- FY2016
- Latest source in this dossier
- FY2016
- Company
- China Jushi / 600176
Read the dated construction and operating milestones below. An installation stage or an engineering-progress percentage does not establish actual production. A programme and its component lines may describe the same capacity at different levels.
Location and identification
Exact physical address and coordinates have not yet been verified for this record.
Verified site coordinates: unavailable. No city-centre point is displayed as a plant location.
The following sections retain the full available English descriptions and their source context. Associated business context describes its named product or base.
FY2016 / Disclosed developments
Sources and scope
What this guide establishes
- Reporting years identify the source filings. Actual event dates are retained in the text and may differ from the reporting year.
- The latest disclosure year for this object is not confirmation of its current operating status. Coverage is selected, not an exhaustive account of every report.
- Capacity, output, sales, construction progress and expenditure are separate measures. Programme and component capacities are not added together.
- Company contact addresses are location leads. They do not establish exact plant boundaries or the footprint of individual projects.
Chinese / A-share / Chinese Accounting Standards / Published 2017-03-21
PDF SHA-256: aa002910e2f04f6c6a30d3195854c189d363d9f2ad18ff831c5e2a2abbb7b4c2