The same discussion identifies phase I of the Chengdu 140,000-tonne tank-furnace drawing-line technical-upgrade programme as starting cold repair and upgrading. This is kept separate from the Tongxiang programme even though both were carried out during the year and share a phase-I label. The cited passage describes intended improvements in quality and capacity efficiency, rather than the commissioning of an entirely new 140,000-tonne furnace.
At a glance
- Record type
- Project
- Earliest source in this dossier
- FY2015
- Latest source in this dossier
- FY2015
- Company
- China Jushi / 600176
Read the dated construction and operating milestones below. An installation stage or an engineering-progress percentage does not establish actual production. A programme and its component lines may describe the same capacity at different levels.
Location and identification
Exact physical address and coordinates have not yet been verified for this record.
Verified site coordinates: unavailable. No city-centre point is displayed as a plant location.
The following sections retain the full available English descriptions and their source context. Associated business context describes its named product or base.
FY2015 / Disclosed developments
Sources and scope
What this guide establishes
- Reporting years identify the source filings. Actual event dates are retained in the text and may differ from the reporting year.
- The latest disclosure year for this object is not confirmation of its current operating status. Coverage is selected, not an exhaustive account of every report.
- Capacity, output, sales, construction progress and expenditure are separate measures. Programme and component capacities are not added together.
- Company contact addresses are location leads. They do not establish exact plant boundaries or the footprint of individual projects.